• Automation of Data Collection and Online Monitoring of the Shop floor

MES in Coca-Cola:

Benefits obtained by CVI with the installation of PC-Factory in the Santa Maria plant:

  • Improvement in quality of information from the shop floor;
  • Reduction in material losses;
  • Reduction in stock differences;
  • Increase of productivity.

APS in Bosch:

The installation of an APS Solution in the tool room of Bosch led to significant improvements in meeting delivery deadlines. With an average of 50% of On Time Delivery (OTD) prior to the project, Bosch reached 80% of OTD in one month and 100% in the second month after installation of the APS.

OEE in Black&Decker:

  • Reduction of 32% in the occurrence of stoppages
  • Reduction of 12% in Planned Stoppages
  • Reduction of 70% in Unplanned Stoppages
  • Reduction of 76% in Rejects
  • Increase of OEE in 20 percentage points

Get the full success story:

Bloco K in Cordeiro with PC-Factory:

With the utilization of PC-Factory MES, Cordeiro will enjoy these benefits:

  • Identification and collection of data with barcodes of the materials consumed and produced by production order;
  • Traceability of the finished product;
  • Automation of production reporting to ERP;
  • Precise information for Bloco K of SPED Fiscal, without the risk of generating inventory discrepancies.

WMS in Alstom:

  • 100% accurate locations
  • Reduction of 20% in missing parts due to wrong placement of materials
  • Productivity gain of 15% in materials separation
  • Increase of 20% in the level of stock accuracy

Lean Execution in Magna Cosma:

Results from installation of the Online Management of OEE and Electronic Kanban with PC-Factory:

  • Improvement in productivity
  • Increase of OEE from 62% to 75% in 3 months
  • Reduction of lead-times
  • Increase of stock turnover from 10 to 15 with coverage of 1 day for Finished Products and 2 days for Raw Materials

MES in Coca-Cola:

Benefits obtained by CVI with the installation of PC-Factory in the Santa Maria plant:

  • Improvement in quality of information from the shop floor;
  • Reduction in material losses;
  • Reduction in stock differences;
  • Increase of productivity.

APS in Bosch:

The installation of an APS Solution in the tool room of Bosch led to significant improvements in meeting delivery deadlines. With an average of 50% of On Time Delivery (OTD) prior to the project, Bosch reached 80% of OTD in one month and 100% in the second month after installation of the APS.

OEE in Black&Decker:

  • Reduction of 32% in the occurrence of stoppages
  • Reduction of 12% in Planned Stoppages
  • Reduction of 70% in Unplanned Stoppages
  • Reduction of 76% in Rejects
  • Increase of OEE in 20 percentage points

Get the full success story:

Bloco K na Cordeiro com PC-Factory:

Com o uso do PC-Factory MES, a Cordeiro terá os benefícios:

  • Identificação e coleta de dados com códigos de barras dos materiais consumidos e produzidos por ordem de produção;
  • Rastreabilidade do produto acabado;
  • Automação do reporte de produção para o ERP;
  • Informações precisas para o Bloco K do SPED Fiscal, sem o risco de gerar diferenças de inventário.

WMS in Alstom:

  • 100% accurate locations
  • Reduction of 20% in missing parts due to wrong placement of materials
  • Productivity gain of 15% in materials separation
  • Increase of 20% in the level of stock accuracy

Lean Execution in Magna Cosma:

Results from installation of the Online Management of OEE and Electronic Kanban with PC-Factory:

  • Improvement in productivity
  • Increase of OEE from 62% to 75% in 3 months
  • Reduction of lead-times
  • Increase of stock turnover from 10 to 15 with coverage of 1 day for Finished Products and 2 days for Raw Materials

PPI-Multitask has been working for 25 years to help its clients achieve operational excellence on the shop floor, applying Information Technology and Automation together with the best manufacturing practices.

IT for Manufacturing:
MES
Lean Execution - OEE - Kanban Eletrônico
WMS
APS

Consultancy for Manufacturing:
Consultancy for Ongoing Improvements of OEE

Industrial Automation:
Automation of Processes and Utilities
Automation of Safety of Machines

 



What our clients have to say:

User

Cássio Macedo de Toledo

Industrial Manager of PremieR Pet

The solution minimized operational errors, guaranteed more agility in the decision-making process and facilitated follow-up of processes thanks to online monitoring.


User

Fernando César Bortolozzo

Production Manager of Black & Decker

PC-Factory was essential for achieving the targets defined by the Lean Six Sigma program.


User

Claudemir Dioto

Supply Chain Manager of Newton

PC-Factory has managed to combine technology with management tools, making internal control, information management and decision-making all much more objective and impressively simple.


User

Alan Cardoso

General Manager / Plant Manager of Qualitec

With PC-Factory it is certainly possible to identify problems and introduce improvements in quality, cost, productivity or delivery times. Since Qualitec finds itself in a highly competitive environment, we greatly appreciate any opportunity to reduce costs and add value.


Fill out the form below under so we can serve you.

If you prefer to send email or phone:

contato@ppi-multitask.com.br
+55 11 3097-3100
+55 11 3034-5346

Rua Madalena, 300 – Vila Madalena
São Paulo – SP
CEP 05434-010

  (*) Required fields.